Drywalling (plasterboard construction)
Drywalling of walls and ceilings – for new room layouts, refurbishments or demanding commercial projects. Our plastering team handles profile installation, boarding and finishing, including doors and openings.
- Stud partitions – for new room layouts, including at great height
- Ceiling constructions – suspended, with preparation for lighting
- Sound insulation and thermal insulation – matched to the use
- Coordination with electrical and plumbing – if needed through our partner network
- Service
- Drywalling (walls and ceilings)
- Department
- Plastering
Drywalling explained briefly
How high can drywalls be built?
We have already built drywalls over 7.5 metres high – with a suitable profile structure, that is not a problem even for large commercial premises.
Is drywalling also suitable for sound insulation?
Yes. With the right stud structure, insulation and boarding, sound insulation can be improved in a targeted way – we will advise you on the right solution for offices or living spaces.
How long does it take to install a drywalls?
Depending on size and level of finish (including doors and electrical preparation), usually a few days per room – we schedule this in the construction programme together with the other trades.
What this looks like in practice



How it works
- Measuring and advice – We clarify what the wall has to do: just divide the room, provide sound insulation, fire protection, or take load-bearing fixings for doors and fittings.
- Planning the construction – profile type, stud spacing, single or double boarding, insulation – these decide stability and the sound insulation value.
- Installation – fix the profiles, have the services run through, apply the boards. For tall walls, with the necessary bracing.
- Filling and finishing – Q1 to Q4 – depending on whether the surface will be wallpapered, painted or lit by raking light.
- Handover to painting – Straight within the company: our painting department takes over the finished surface, with no lost time between two firms.
7.5 metre high drywalls
For a commercial building on Freiburgstrasse in Bern, we built drywalls over seven metres high – with reinforced profile structure, boarding on both sides and finishing, carried out during ongoing construction alongside other trades.
Quote within 48 hours
Free, without obligation and at a fixed price – site visit on request.