Home / Plastering / Drywalling

Drywalling (plasterboard construction)

Drywalling of walls and ceilings – for new room layouts, refurbishments or demanding commercial projects. Our plastering team handles profile installation, boarding and finishing, including doors and openings.

  • Stud partitions – for new room layouts, including at great height
  • Ceiling constructions – suspended, with preparation for lighting
  • Sound insulation and thermal insulation – matched to the use
  • Coordination with electrical and plumbing – if needed through our partner network

Enquire about a drywalling project

Service
Drywalling (walls and ceilings)
Department
Plastering

Reference project: 7.5 m high drywalls ->

Frequently asked questions

Drywalling explained briefly

How high can drywalls be built?

We have already built drywalls over 7.5 metres high – with a suitable profile structure, that is not a problem even for large commercial premises.

Is drywalling also suitable for sound insulation?

Yes. With the right stud structure, insulation and boarding, sound insulation can be improved in a targeted way – we will advise you on the right solution for offices or living spaces.

How long does it take to install a drywalls?

Depending on size and level of finish (including doors and electrical preparation), usually a few days per room – we schedule this in the construction programme together with the other trades.

← Back to the plastering overview

From our projects

What this looks like in practice

Drywalls over 7.5 metres high under construction, commercial building in Bern
Drywalls over 7.5 metres high under construction, commercial building in Bern
The same area after completion, commercial building in Bern
The same area after completion, commercial building in Bern
New room layout in drywalling, commercial building in Solothurn
New room layout in drywalling, commercial building in Solothurn
Process

How it works

  • Measuring and advice – We clarify what the wall has to do: just divide the room, provide sound insulation, fire protection, or take load-bearing fixings for doors and fittings.
  • Planning the construction – profile type, stud spacing, single or double boarding, insulation – these decide stability and the sound insulation value.
  • Installation – fix the profiles, have the services run through, apply the boards. For tall walls, with the necessary bracing.
  • Filling and finishing – Q1 to Q4 – depending on whether the surface will be wallpapered, painted or lit by raking light.
  • Handover to painting – Straight within the company: our painting department takes over the finished surface, with no lost time between two firms.
Our reference project

7.5 metre high drywalls

For a commercial building on Freiburgstrasse in Bern, we built drywalls over seven metres high – with reinforced profile structure, boarding on both sides and finishing, carried out during ongoing construction alongside other trades.

View the project →

Fire and sound protection: With the right construction, a drywalls meets high requirements: special boards for fire protection, double boarding and insulation for sound insulation, decoupled studs against structure-borne noise. What your wall has to do, we clarify before planning – that decides the build-up and choice of materials.

Quote within 48 hours

Free, without obligation and at a fixed price – site visit on request.

Request a quote 031 971 88 66